🚨 Flood Recovery Help: Visit our Recovery Hub for support, updates, and assistance after the recent flooding.
Recovery Hub
We will be collecting flood damaged waste from kerbsides in flood impacted areas.Register for collection by calling us on 7955 7777 and selecting option 1.
Call now
Design Guide and Construction Specifications for large scale engineering works.We have adopted AUS-SPEC as our Engineering Development Specifications for design and construction of civil infrastructure works. The use of these will ensure the required standards are maintained.
MidCoast Council is responsible for town water and sewerage issues relating to new development.This includes new subdivisions, commercial, residential development and additions/alterations to existing structures.
When planning a development there may be environmental factors that need to be taken into consideration. Different factors can apply depending on the location of the development.