🚨 Flood Recovery Help: Visit our Recovery Hub for support, updates, and assistance after the recent flooding.
Recovery Hub
Property owners can contact us to register for free flood waste collection. This service is only available to properties that have been genuinely impacted.Register for collection by calling us on 7955 7777 and selecting option 1.
Call now
Design Guide and Construction Specifications for large scale engineering works.We have adopted AUS-SPEC as our Engineering Development Specifications for design and construction of civil infrastructure works. The use of these will ensure the required standards are maintained.
MidCoast Council is responsible for town water and sewerage issues relating to new development.This includes new subdivisions, commercial, residential development and additions/alterations to existing structures.
When planning a development there may be environmental factors that need to be taken into consideration. Different factors can apply depending on the location of the development.