What we've achieved

Things are changing - look how far we've come.

Take a look below to find out what works have been completed in recent years.

The table below outlines works completed in the 2018/19 financial year, with those shown in orange highlighting projects funded through the $100M Road Upgrade Program.

You can also view the video below to see what we achieved in 2017.

Project  Locality Scope of Works

 Carryover Projects from FY17/18

The Bucketts Way stage 5 with Kelly's Bridge  Burrell Creek

Replacement of timber bridge with concrete culvert plus road alignment improvement ‐ 700m

 Lee St / Stroud St Bulahdelah  Bulahdelah 

Road reconstruction and drainage improvement on Lee St and Stroud St including roundabout construction ‐ 420m 

 Hadley St ‐ Lake St (primary school frontage)
 Forster   New kerb & gutter plus road rehabilitation between Lake St and Head St - 260m
 Pulteney St ‐ Albert to Wynter   Taree  Full road reconstruction incl K&G, pavement, footpaths, retaining walls - 200m
 Hume St - Barrington St to Church St  Gloucester  Road rehabilitation ‐ 180m
 Manning Regional Art Gallery Carpark  Taree  Carpark construction
 Booral Rd  Crawford River  Road rehabilitation ‐ 900m
 Boomerang Dr/The Lakes Way ‐ No 8 Oasis C/Pk  Blueys Beach  Road rehabilitation
 Hannam Vale Rd ‐ 9.7 to 10.94km  Hannam Vale  Road rehabilitation - 1.2km
 Hannam Vale Rd - 11.36km to 11.94km  Hannam Vale  Road rehabilitation - 580m
 Blackhead Rd  Hallidays Point  Road rehabilitation - 600m
 MR111 ‐ The Lakes Way ‐ Boomerang Dr Intersection  Charlotte Bay  Improvement of intersection at Boomerang Drive ‐ 290m + 50m
 Old Bar Road ‐ Warwiba to Berady Lane  Old Bar  Road rehabilitation
 Bulga Bridge  Bobin  Replacement of timber bridge, Bulga Road
 Bobin Bridge   Bobin  Replacement of timber bridge, Bulga Road
 Old Bar to Pacific Highway Cycleway  Glenthorne / Pampoolah /
 Old Bar
 Gravel path between Old Bar and Follies Road,   directional signage
 Cedar Party Creek Bridge - Design  Wingham  Design for replacement of existing bridge / new road approaches / new alignment

 Urban Rehabilitation

   
 Coomba Rd / Kirribilli - Tallawalla  Coomba Park  360m length
 Coomba Rd / Warramutty Nth - Coolangatta  Coomba Park  500m length
 King George Pde (Victor/Cavill & Cavill / Elizabeth)  Forster  620m length
 Black Head Rd/Main St (High St / Gordon Ave)  Black Head  440m length
 Pulteney Street Stage 2 (Albert to Wynter Streets)  Taree  Carry over (see above)
 Reidsdale Rd (MR 90 / End K & G)  Stroud Road  315m length
 Sunbakers Dr (Alice / Lot 14)  Forster  150m length
 Lake St / Cross St Roundabout  Forster  Upgrade of roundabout infrastructure
 Guya Ave / Anchorage - Boulevarde  Hawks Nest  100m length
 Market St / Queen St - Denison St including int.  Gloucester  130m length 
 Wootton Cres  Taree  50m length

 Urban Construction

   
 Stuart St (Hoskins St / End)  Nabiac   110m length - gravel road upgrade to bitumen seal
 Byron St (Donaldson St / End)  Nabiac  160m length - gravel road upgrade to bitumen seal
 Saville St (Berkeley St / Western End)  Stroud  80m length - gravel road upgraded to bitumen seal
 Rosewood St (Ann St - Church St)  Bulahdelah  90m length - gravel road upgraded to bitumen seal
 Donaldson St (Wharf St / Byron St)  Nabiac  150m length - gravel road upgrade to bitumen seal
 Warri St (Koree St to water)  Pindimar  230m length - gravel rd upgrade to bitumen seal  

State Rd RMCC Works

   
 Head / Macintosh St Project  Forster  Install of pedestrian refuge & pavement resurface
 Head St Project - Reserve Rd to Beach St  Forster  Pavement reconstruction
 Reseal Seg 470  Darawank  Bitumen reseal - multi year program
 Asphalt resurfacing  Forster  Head St into Macintosh St
 Pavement reconstruction  Forster  KFC southbound

 Other Internal Council Works

   
 Jimmys Beach Sand Transfer System  Hawks Nest  Sand transfer system from Winda Woppa to Jimmys Beach
 Marine Facilities, Tea Gardens  Tea Gardens  Installation of new T-pontoon, timber wharf, shelters, repositioning existing fender
 piles
 Dredging Program - The Gut  Tea Gardens  6,800m3 pumped across 3.5km to Winda Woppa from Slip Island Mooring area
 Boating Now - Boat Ramp, Harrington Reserve  Harrington  Extending length of ramp
 Boating Now - Boat Ramp, Bohnock  Bohnock  Additional bay of car / boat parking
 Boating Now - Boat Ramp, Andrews Reserve  Taree  Extending length of ramp

Rural Rehabilitation

   
 Boondelbah Rd / Toonang - Toonang  Tea Gardens  380m length, segment 10
 Upper Myall Rd  Upper Myall  400m length, rehabilitate existing road
 Markwell Rd    Bulahdelah  2,260m length, segment 54, 60, 62, 64
 Barrington East Rd  Barrington  950m length, segment 50, 60
 Scone Rd

 Barrington/Copeland

 570m length, segment 60
 Willina Rd  Coolongolook  Extending seal on currently unsealed segment
 Bombah Point Rd  Bombah Point  Extending seal on currently unsealed segment

 Regional Rehabilitation

   
 Commerce St  Taree  COS Start Commerce Street - COS Deb Street
 The Lakes Way (Tea Tree Road intersection)   Forster  600m length
 The Lakes Way (Sweet Pea Road intersection)  Forster  580m length
 The Lakes Way (South of Bungwahl last stage)  Bungwahl  320m length
 Old Bar Rd - Warwiba to Berady Lane  Old Bar  1,240m length
 MR 7719 Thunderbolts Way / 90/80kph speed sign to COS - Seg 580  Baxters Ridge  780m length
 MR 7719 Thunderbolts Way - Seg 615  Mares Run  420m length - plus seal for 625 - 640 segment
 The Lakes Way, Charlotte Bay  Charlotte Bay  720m length
 Stroud Hill Road - 2.2km west of The Bucketts Way  Stroud Road / Washpool  2,120m length
 Gloucester Road - Nowendoc Road to river  Killawarra  2,100m length

 Concrete Works

   
 Black Head Shared Path - Connecting Centres (Cycling) -   Infrastructure  Black Head  1.5km cycleway, Black Head

Stormwater

   
 Forster Keys drainage re-lining  Forster  Repair failing council drainage pipes
 Cape Hawke Drive  Forster  Box culvert installation